site visit 44 noble st jun 12 - arrived 9:10, director + facilities dir on site, in thru staff entrance off franklin

gallery 3 skylight - stain on the deck below, facilities says it leaks "when the wind is right"
clear hts: main gallery ~13'-9" under beams?? remeasure - drawings from 1968 say 15'-0"
freight elevator: original 1968 cab, 6'-0" deep - the big canvases have been coming in thru the lobby doors at an angle. not ok
climate: single AHU from the 1994 renovation, facilities engineer says "she's original" - doubtful for any loan show

director wants "daylight in the new wing" - big deal, said it twice

client q's from walk:
- rooftop pavilion + sculpture terrace - yes or no, and when do we know. director really wants it
- timeline for filing - gala is end of july, keeps asking, told them need zoning analysis first
- cafe "someday" - parked it

roof: membrane around the skylights soft underfoot NE corner, ask structural
cellar storage: crowded, crates double-stacked, registrar wants to talk - schedule it

TODO ME: send director recap, get zoning consultant memo started, chase the 1998 asbestos survey, talk to registrar re storage
next visit w/ structural - week of jun 23?